P.S. NewDumps在Google Drive上分享了免費的、最新的Project-Management考試題庫:https://drive.google.com/open?id=17SpFBHyTy80lSHce_zj3kzyFhWVXvX6c
如果你想在短時間內,以最小的努力,達到最有效果的結果NCARB的Project-Management考試準備,你可以使用NewDumps NCARB的Project-Management考試培訓資料,NewDumps的培訓資料是通過實踐檢驗了的,也是通過眾多考生證明了它確實可以百分百通過考試,利用了它,你將達到你的目的,得到最佳的效果。
| 主題 | 簡介 |
|---|---|
| 主題 1 |
|
| 主題 2 |
|
| 主題 3 |
|
| 主題 4 |
|
| 主題 5 |
|
您可以先在網上下載NewDumps為你免費提供的關於NCARB Project-Management認證考試的練習題及答案作為嘗試,之後你會覺得NewDumps給你通過考試提供了一顆定心丸。選擇NewDumps為你提供的針對性培訓,你可以很輕鬆通過NCARB Project-Management 認證考試。
問題 #72
A project achieves refinement and coordination in which of the following phases?
答案:B
解題說明:
Design Development (DD) is the phase where schematic concepts are refined and systems are coordinated across disciplines. This includes structure, MEP, and materials. While Schematic Design focuses on high- level form and layout, and Construction Documents focus on detailed drawings/specifications, DD ensures integration and alignment before detailing.
References:
NCARB ARE 5.0 Handbook - Design phases
AIA B101 - Design Development phase scope
問題 #73
What is the primary purpose of a punch list?
答案:A
解題說明:
A punch list is a document prepared near project completion that identifies incomplete or nonconforming work requiring correction before final payment. It ensures all parties agree on outstanding items and facilitates project closeout. Punch lists are a key concept in ARE 5.0 PjM related to construction phase closeout procedures.
問題 #74
The architect is on site to evaluate the completed work by the contractor. During the evaluation, the architect notices a structural connection that deviates from the contract documents.
According to AIA B101, to which party should the architect report this observed deviation?
答案:C
解題說明:
Per AIA B101 § 3.6.2.1, the architect is required to notify the owner of any deviations from the contract documents observed during site visits. While the architect may also discuss it with the contractor and engineer, the formal obligation is to report it to the owner. The contractor is ultimately responsible for conformance with contract documents, and further action (like issuing a notice of nonconformance or requiring correction) may follow.
References:
AIA B101-2017 § 3.6.2.1
AIA A201-2017 §§ 3.3 and 4.2
NCARB ARE 5.0 Handbook - Construction Administration Task Overview
問題 #75
During the preparation of the construction documents, it was noted that the survey inaccurately located the property line. Consequently, the parking layout had to be redesigned to fit within the corrected property boundary.
The architect's additional costs and associated delay are the responsibility of which one of the following parties?
答案:B
解題說明:
According to AIA B101 §5.1, the owner is responsible for providing the site survey and other site-related documentation. If the survey is inaccurate and causes delays or extra services, the owner is responsible for costs incurred. The architect should submit a claim for additional services.
* Surveyors are contracted by the owner (not by the architect unless explicitly stated).
* The architect is not liable for incorrect information furnished by the owner.
* Reference: AIA B101 §5.1 and §3.6
* NCARB ARE 5.0 Handbook - PjM Content Area 2: Budget and Contracts
\====================
問題 #76
A contractor has hired a subcontractor to construct a parking lot for 60 cars. The parking lot will be 60 feet x
270 feet. The subcontractor has quoted a price of $13.25 per square yard to the contractor.
If the contractor adds a mark-up of 15%, what is the cost of each parking space?
答案:B
解題說明:
Comprehensive Detailed Explanation:
Step 1: Calculate area in square feet:
60 ft × 270 ft = 16,200 sq ft
Step 2: Convert to square yards:
16,200 sq ft ÷ 9 = 1,800 sq yd
Step 3: Calculate base cost:
1,800 sq yd × $13.25 = $23,850
Step 4: Add 15% markup:
$23,850 × 1.15 = $27,427.50
Step 5: Divide total cost by 60 parking spaces:
$27,427.50 ÷ 60 = $457.13 # Approx. $457 per space
References:
NCARB ARE 5.0 Handbook - Cost estimating and budgeting
CSI MasterFormat - Division 32 (Exterior Improvements)
ARE 5 Review Manual - Project Management, Cost and Quantity Takeoffs
問題 #77
......
NewDumps不僅為你提供優秀的資料,而且還為你提供優質的服務。如果你購買了NewDumps的考古題,NewDumps將為你提供一年的免費更新。這樣你就可以一直擁有最新的Project-Management試題資料。而且,萬一你用了Project-Management考古題以後,考試還是失敗的話,NewDumps保證全額退款。這樣一來,你還擔心什麼呢?NewDumps對自己的資料有足夠的信心,你也要對NewDumps有足夠的信心。為了你的考試能夠成功,千萬不要錯過NewDumps這個網站。因為如果錯過了它,你就等於錯失了一次成功的機會。
Project-Management软件版: https://www.newdumpspdf.com/Project-Management-exam-new-dumps.html
P.S. NewDumps在Google Drive上分享了免費的、最新的Project-Management考試題庫:https://drive.google.com/open?id=17SpFBHyTy80lSHce_zj3kzyFhWVXvX6c